Related Projects
Check out these similar projects that our team has successfully completed.
This bridge was a challenge to construct with no road access. Robson partnered with G. Carson Logging to design and build a 300-meter clear span skyline cable system to deliver concrete and bridge components through the forest canopy. This cable system minimized the impact to the environment and allowed for the concrete mixing to be done at a safe distance away from the fish-bearing stream.