Goat River Cable Car Replacement

Robson was contracted by Fraser Headwaters Alliance to replace the old cable car on the historic Goat River Trail. All materials, tools, equipment and a small work camp was flown or hiked into site.

 

Scope of Work:

  • Relocate cable car to allow for a higher crossing
  • Supply and install two A frame towers
  • Two Concrete pads
  • Supply and install new anchor system, duck bill and rock anchors
  • Supply and install new main cable and pull rope
  • Create maitenance manual for cable car

“Thank you to Ross McKirdy, Andreas Thoni and crew of Robson Design Build for the very excellent and professional work on the cable car project.” 

-Roy Howrad, Fraser Headwaters Alliance

  • All materials, equipment and tools flown in by helicopter or hiked into site

  • Cable Car spanned 36m over the Goat River